Arctic Grayling were collected at designated stations on the Oksrukuyik from 1990 to current time. Phosphorus addition has occurred from 1991 to 1996; station sites are relative distance from the original 1991 dripper. Grayling were caught, pit tagged, weighed, measured, and then released back into the river.
Data Set Results
Displaying 1 - 2 of 2
Since 1983, the Streams Project at the Toolik Field Station has monitored physical, chemical, and biological parameters in a 5-km, fourth-order reach of the Kuparuk River near its intersection with the Dalton Highway and the Trans-Alaska Pipeline. In 1989, similar studies were begun on a 3.5-km, third-order reach of a second stream, Oksrukuyik Creek. Fish were collected on each river. Station locations, representing kilomter values certain distances from original phosphorus dripper (see method) were noted.