Since 1983, the Streams Project at the Toolik Field Station has monitored physical, chemical, and biological parameters in a 5-km, fourth-order reach of the Kuparuk River near its intersection with the Dalton Highway and the Trans-Alaska Pipeline. In 1989, similar studies were begun on a 3.5-km, third-order reach of a second stream, Oksrukuyik Creek. Fish were collected on each river. Station locations, representing kilomter values certain distances from original phosphorus dripper (see method) were noted.
Data Set Results
Displaying 1 - 3 of 3
From 2009 to 2017, the FISHSCAPE Project (grant numbers 1719267, 1417754, and 0902153), based at Toolik Field Station, has monitored physical, chemical, and biological parameters within three watersheds: The Kuparuk (including Toolik Lake and Toolik outlet stream); The Sagavanirktok (primarily Oksrukuyik Creek, but also including sections of the Ailish and Atigun Rivers and the Galbraith Lakes); and The Itkillik (primarily the I-Minus outlet stream, a tributary that that feeds into the Itkilik River).
Since 2009, the FISHSCAPE Project (grant number 1719267, 1417754, and 0902153), based at Toolik Field Station, has monitored physical, chemical, and biolog